
Loddon Mallee region
Find out about the maintenance work being done in the Loddon Mallee region.
We’re busy rebuilding, repairing and resurfacing roads right across the state, including key routes across the Loddon Mallee Region.
This year's road maintenance program is targeting high-traffic areas and busy freight routes, including some of the most important roads connecting communities in the north.
We regularly inspect roads and carry out emergency repairs as needed, while more extensive works, such as road rebuilding and rehabilitation, are delivered during the warmer, drier months from September to May to ensure repairs are long-lasting.
Murray Valley Highway, Piangil
Rehabilitation works on a 1.2 kilometre section of the Murray Valley Highway, Piangil, between Heath Road and Stewart Road are expected to start in early June 2026 and take approximately five weeks to complete, weather permitting.
Works involve pavement reconstruction using asphalt to restore and improve the condition of the road surface.
Crews will be working from 6am to 6pm, Monday to Friday from early June to mid-July. Works are weather dependent and will pause during the Kings Birthday Weekend Holiday period.
During works there will be lane closures under traffic management and a reduced speed of 40 km/h in place. Delays of 5-10 minutes should be expected.
A single lane closure will be in place after hours for certain stages of the works. There will be shuttle flow at reduced speed in place with temporary traffic signals.
Please plan ahead and allow extra travel time.
Seventh Street between Etiwanda Avenue and San Mateo Avenue, Mildura
Additional rehabilitation works on a 600 metre section of Seventh Street, Mildura between Etiwanda Avenue and San Mateo Avenue are expected to start 9 June 2026 and take 4 weeks to complete, weather permitting.
Our crew will be onsite delivering kerbing works from 9 June to 12 June 2026, working from 7am to 5pm.
This will be followed by road rehabilitation works from 15 June 2026, with our crews working overnight from 6:30pm to 6:30am. These works are expected to start on 15 June 2026 and take 3 weeks to complete, weather permitting.
Works involve pavement improvements and spray sealing to restore the condition of the road.
During works there will be lane closures in place with signed detours for local traffic and heavy vehicles to use Buronga-Mildura South Road or alternatively Fifteenth Street. A 40km/h speed reduction will be in place during these works.
Please plan ahead and allow extra travel time.
Maintenance program 2025-26
Rehabilitation works on the following roads in the Loddon Mallee region will be undertaken between now and mid-2026:
- Midland Highway
- between Taylor Road and Darrigan Road at Corop (1.9km) in Campaspe Shire
- between Roberstons Road and Stewart Road at Carag Carag (1.8km) in Campaspe Shire
- Murray Valley Highway, between Stewart Road and Heath Road at Piangil (1.2km) in Rural City of Swan Hill
- Heathcote-Kyneton Road, between Vereker Lane and Saleyards Road at Kyneton (2.1km) in Macedon Ranges Shire
- Bendigo-Maldon Road, between Stump Street and Bridgewater-Maldon Road at Maldon (1.5km) in Mount Alexander Shire
- Echuca-Mitiamo Road, between Crossman Road and Millar Road at Mitiamo (1km) in Shire of Campaspe
- Birchip-Sea Lake Road, between Karyrie Station Road and Opie Road at Birchip (1.7km) in Buloke Shire
- Boort-Charlton Road, between Buckrabanyule North Road and Quarry Road at Nareewillock (1.9km) in Buloke Shire
- Dunach-Eddington Road, between Mullins Road and Carisbrook-Betley Road at Eddington (1km) in Central Goldfields Shire
- Sea Lake-Swan Hill Road, between Waitchie Road and Bell Road at Ultima East (1km) in Swan Hill Rural City
Works completed
Boort-Charlton Road, Nareewillock
We’ve completed rehabilitation works on a 1.9 kilometre section of the Boort-Charlton Road, Nareewillock, between Buckrabanyule North Road and Quarry Road.
Our crews used a foamed bitumen treatment successfully on this project, providing a smoother safer journey for all road users.

Image : Boort-Charlton Road, Nareewillock

Image : Boort-Charlton Road, Nareewillock

Image : Boort-Charlton Road, Nareewillock
Calder Freeway off ramp to Black Forest Drive and on ramp from Mount Macedon Road
We’ve delivered vital maintenance works on the Calder Freeway off ramp to Black Forest Drive and on ramp from Mount Macedon Road,
Midland Highway at Carag Carag and Corop
We’ve completed rehabilitation works on two sections of the Midland Highway.
Section 1 was 1.9 kilometres of the Midland Highway between Taylor Road and Darrigan Road at Corop.
Section 2 was 1.8 kilometres of the Midland Highway between Robertsons Road and Stewart Road at Carag Carag.
These works involved pavement improvements, spray sealing works and linemarking to restore the condition of the road.

Images: Midland Highway at Corop and Carag Carag

Images: Midland Highway at Corop and Carag Carag

Images: Midland Highway at Corop and Carag Carag
Holdsworth Road (Long Gulley-White Hills Road) resurfacing works, White Hills
We’ve completed resurfacing works on Holdsworth Road (Long Gully-Whit Hills Road) in White Hills.
The works were undertaken between St Killian Street and Napier Street in the City of Greater Bendigo.
Reservoir Road and Powells Avenue (Strathdale-White Hills Road), Kennington and Strathdale
We’ve completed resurfacing works on two sections of Strathdale-White Hills Road in the City of Greater Bendigo.
Sea Lake-Swan Hill Road, Ultima
We’ve completed rehabilitation works on a 1.0 kilmetre section of the Sea Lake-Swan Hill Road, Ultima, between Waitchie Road and Bell Road.
These works involved pavement improvements and spray sealing works that has restored the condition of the road and now provides a smoother, safer journey for all road users.

Image: Completed works on the Sea Lake-Swan Hill Road at Ultima
Bendigo-Maldon Road, Maldon
We’ve completed the rehabilitation works on a 1.5 kilometre section of the Bendigo-Maldon Road, Maldon, between Stump Street and Bridgewater-Maldon Road.
These works now provide a smoother, safer journey for all road users.

Image: Completed works on the Bendigo-Maldon Road, Maldon
Birchip-Sea Lake Road, Birchip
We’ve completed the rehabilitation works on a 1.8 kilometre section of the Birchip-Sea Lake Road, Birchip.
These works involved pavement improvements and spray sealing works the has restored the condition of the road and now provides a smoother, safer journey for all road users.

Images: Completed works on the Birchip-Sea Lake Road, Birchip
Macedon-Woodend Road, Woodend
During December 2025, we repaired the sub-surface drainage and pavement on Macedon-Woodend Road (High St), near the Woodend Primary School.

Image: Completed works at Macedon-Woodend Road, Woodend
Heathcote-Kyneton Road, Kyneton
We’ve reconstructed 2.1 km of the Heathcote-Kyneton Road, Kyneton between Vereker Lane and Saleyards Road at Kyneton in Macedon Ranges Shire.
These works now provide a smoother, safer journey for all road users.

Images: Heathcote-Kyneton Road, Kyneton
Echuca-Mitiamo Road, Mitiamo
We’ve reconstructed 1.0 km of the Echuca-Mitiamo Road, Mitiamo between Millar Road and Crossman Road in the Campaspe Shire.
These works now provide a smoother, safer journey for all road users.

Image: Echuca-Mitiamo Road, Mitiamo
Resurfacing work will also be carried out on many roads across the Loddon Mallee region as part of the 2025-26 Victorian road maintenance program:
| Road | Location and LGA |
|---|---|
| Calder Highway |
|
| Northern Highway |
|
| Murray Valley Highway |
|
| Loddon Valley Highway |
|
| Mallee Highway |
|
| Pyrenees Highway |
|
| Calder Alternative Highway |
|
| St Arnaud-Wycheproof Road |
|
| Birchip-Sea Lake Road |
|
| Mount Macedon Road |
|
| Kyneton Main Road |
|
| Prairie-Rochester Road |
|
| Birchip-Rainbow Road |
|
| Golden Square-Quarry Hill Road |
|
| Bacchus Marsh-Gisborne Road |
|
| Kyneton-Trentham Road |
|
| Donald-Murtoa Road |
|
| Bridgewater-Maldon Road |
|
| Long Gully-White Hills Road |
|
| Strathdale-White Hills Road |
|
| Bridgewater-Dunolly Road |
|
| Macedon Woodend Road |
|
| Logan-Wedderburn Road |
|
| Sea Lake-Swan Hill Road |
|
| Dumosa-Quambatook Road |
|
| Boort-Pyramid Road |
|
| Boort-Kerang Road |
|
| Boort-Charlton Road |
|
| Echuca-Mitiamo Road |
|
| Bendigo-Murchison Road |
|
| Lancefield-Tooborac Road |
|
| Gisborne-Kilmore Road |
|
| Melbourne-Lancefield Road |
|
| Golden Square-Long Gully Road |
|
Note: We regularly inspect every single kilometre of our arterial road network. This program is subject to change based on expert inspections and in-depth technical data, ensuring that works are delivered where local drivers need them most.
Get in touch
If you have any questions about these projects, please contact DTP:
Email: [email protected]
Call: 133 778