Toorak Road maintenance
Planned
What we’re doing
We’re delivering vital maintenance works on Toorak Road between Kooyong Road in Toorak and Milton Parade in Malvern.
These works will involve replacing layers of the road, asphalt resurfacing and line marking to restore the condition of the road surface.
This work is being delivered as part of the Victorian Government’s $964 million investment in the Victorian 2024-25 road maintenance program.
When to expect us
Works are expected to take place over three weeks between March and May 2025.
We’ll be working at night to minimise disruption to tram services and traffic, and to keep our crews safe. No works will take place on Friday or Saturday nights.
Please note that dates and times are subject to change due to weather conditions and the contractor’s program of works.
What to expect during works
- Lane and road closures on Toorak Road between Kooyong Road and Milton Parade with signed detours in place. Please allow extra travel time during works.
- Periods of high noise levels, vibrations, and dust – we’ll work to minimise these impacts as much as possible.
- Crews use modern equipment to keep noise to a minimum, however, the works will unavoidably emit some noise and light. For the safety of road users and workers on site, reversing beepers are required on all machinery.
- No parking on Toorak Road within the work zone and periods where driveway access will be restricted. We will contact affected property owners about temporary driveway access restrictions and work to maintain access.
- Periods where sections of the footpath along Toorak Road will be closed. Please observe footpath closures and alternative route signage in place.
- A reduced speed limit during works to ensure the safety of crews and all road users.
Get in touch
Find out more about the Victorian 2024-25 road maintenance program here.
Email: [email protected]
Call: 133 778