Gippsland region
Find out about the maintenance work being done in the Gippsland region.
Maintaining our roads is an essential part of keeping millions of people and hundreds of thousands of tonnes of freight on the move across Victoria.
We regularly inspect roads and carry out emergency repairs as needed, while more extensive works, such as road rebuilding and rehabilitation, are delivered during the warmer, drier months from September to May to ensure repairs are long-lasting.
We will update this page with the new program of resurfacing and rehabilitation in the coming weeks.
Current works
While our major road rebuilds occur during the warmer months, maintaining the road network is a year-round priority. We’re delivering more proactive maintenance during the cooler months when roads experience the greatest stress from rainfall and flooding.
Our crews are out every day inspecting roads for hazards and defects, repairing potholes, surface issues and damaged signs, cleaning gutters and drains, mowing and clearing litter.
Throughout the winter period, we’re doing more works to keep our main freeways open and keep people and freight on the move.
We’ve got additional crews on the network repairing damage caused by recent rain and delivering emergency repairs where and when they’re needed. While the weather is cooler, we’ll continue to deliver increased levels of proactive works to protect against rain and flooding, ensuring our roads stand up to the growing levels of extreme weather we’re seeing.
Maintenance program 2025-26
Over the last year, hundreds of kilometers have been repaired, resurfaced or rebuilt across the state as part of the 2025-26 maintenance season. This includes rebuilding and resurfacing works across the Gippsland region.
This year’s program targeted high-traffic areas and busy freight routes, including some of the most important roads connecting communities in the north.
As part of the program, rehabilitation works on the following roads in Gippsland region were completed:
- South Gippsland Highway
- between Stony Creek-Dollar Road and Whitelaws Track at Stony Creek (820m) in South Gippsland Shire
- between Charles Street and Bridge Street at Korumburra (820m) in South Gippsland Shire
- Stratford-Maffra Road, between Harkness Lane and Beet Road at Maffra (1.4km) in Wellington Shire
- Bass Highway, between Duncans Road and Koonwarra-Inverloch Road at Pound Creek (1.6km) in South Gippsland Shire
- Princes Highway East, between Great Alpine Road and Philips Lane at Bairnsdale (1km) in East Gippsland Shire.
- Phillip Island Road, between Bermagui Crescent and Smiths Beach Road at Rhyll (610m) in Bass Coast Shire.
- Rosedale-Longford Road, between Albert Street and Mill Lane at Rosedale (700m) in Wellington Shire
- Moe-Glengarry Road, between Sawyers Lane and Littles Lane at Tyers (800m) in Latrobe City
Resurfacing works were also carried out on many roads across the Gippsland region.