Barwon South West region
Find out about the maintenance work being done in the Barwon South West region as part of the Victorian road maintenance program for 2024-25.
Some of the most important roads for connecting communities in the Barwon South West region have been included in the 2024-25 road maintenance program.
Maintenance is vital for keeping the Victorian road network running smoothly and ensuring road users can travel safely and efficiently.
Our maintenance program focuses on strengthening roads across the network, with recent efforts directed toward roads impacted by floods and extreme rainfall.
As we move into this year’s maintenance season, the focus will shift to resurfacing and rebuilding roads across the network. This will involve replacing multiple layers of road surfaces to enhance durability and safety for all road users.
Darlington-Camperdown Road rehabilitation works, Bookaar
Rehabilitation works on Darlington-Camperdown Road in Bookaar, between Newminster Road and Kilnoorat Road are underway.
Crews are working on the road surface of the 1.8km stretch of road in Corangamite Shire between 7am and 6pm from Monday 11 November, 2024 to January 2025.
During work hours, there will be single lane closures with traffic management in place and reduced speed limits to ensure the safety of crews and all road users.
Please note: these dates and times are subject to change due to weather conditions.
Terang-Mortlake Road rehabilitation works, Terang
Rehabilitation works on Terang-Mortlake Road in Terang, between McCrae Street and Dalvui Lane are underway.
Crews are working on the road surface of the 3.5km stretch of road in Corangamite Shire between 7am and 6 pm from Monday 11 November, 2024 to March 2025.
During work hours, there will be single lane closures with traffic management in place and reduced speed limits to ensure the safety of crews and all road users.
Please note: These dates and times are subject to change due to weather conditions.
Maintenance program 2024-25
Rehabilitation works on the following roads in the Barwon South West region will be undertaken between now and mid-2025:
- Bayside Road, between Sea Breeze Parade and Shell Refinery, Geelong (2.3km), City of Greater Geelong
- Hamilton Highway, between Racecourse Lane and Castle Carey Road (4.6km), Moyne Shire.
- Terang-Mortlake Road, between Princess Hwy and Mackinnons Bridge Road (4.1km), Corangamite Shire.
- Princes Highway West
- between Old Timboon Road and Cuthberts Road, Camperdown (1.53km) Corangamite Shire.
- between Conns Lane and Illowa, Dennington (2.45km), Moyne Shire.
- between Bacchus Marsh Road centre pier and Anakie Road ramp, Norlane (701m), City of Greater Geelong.
- between Between the Midland Highway centre pier and end of noise wall, Geelong (246m), City of Greater Geelong.
- McKinnons Bridge-Noorat Road, between Princes Highway West and Black Avenue, Noorat (2.74km), Corangamite Shire.
- Surf Coast Highway, between Pioneer Road and Perrett Street, Grovedale (303m), City of Greater Geelong.
Resurfacing work will also be carried out on many roads across the Barwon South West region as part of the 2024-25 Victorian road maintenance program.