Victorian road maintenance program 2024 25

Barwon South West region

Find out about the maintenance work being done in the Barwon South West region as part of the Victorian road maintenance program for 2024-25.


Some of the most important roads for connecting communities in the Barwon South West region have been included in the 2024-25 road maintenance program.

Maintenance is vital for keeping the Victorian road network running smoothly and ensuring road users can travel safely and efficiently.

Our maintenance program focuses on strengthening roads across the network, with recent efforts directed toward roads impacted by floods and extreme rainfall.

As we move into this year’s maintenance season, the focus will shift to resurfacing and rebuilding roads across the network. This will involve replacing multiple layers of road surfaces to enhance durability and safety for all road users.

Image of the newspaper advertisment of the Barwon South West region maintenance program for 2024-2025.

A maintenance fact sheet 

Prince Highway West rehabilitation works, Dennington and Illowa

Rehabilitation works on the Prince Highway West, between Dennington and Illowa, are underway.

Crews are working on the road surface of the 2.45km stretch of road, between Conns Lane and Illowa Road in Moyne Shire between 7am and 6 pm, from Monday 24 February, 2025 to June 2025.

During works, single lane closures are in place, with reduced speed limits to ensure the safety of crews and road users. 

Please note: These dates and times are subject to change due to weather conditions.

Hamilton Highway rehabilitation works, Mortlake and Hexham

Rehabilitation works on the Hamilton Highway, between Mortlake and Hexham, are underway.

Crews are working on the road surface of the 4.6km stretch of road, between Racecourse Lane and Castle Carey Road in Moyne Shire between 7am and 6 pm, from Monday, 20 January 2025 to May 2025.

During works, single lane closures are in place, with reduced speed limits to ensure the safety of crews and road users. 

Please note: These dates and times are subject to change due to weather conditions.

Maintenance program 2024-25

Rehabilitation works on the following roads in the Barwon South West region will be undertaken between now and mid-2025:

  • Bayside Road, between Sea Breeze Parade and Shell Refinery, Geelong (2.3km), City of Greater Geelong
  • Princes Highway West
    • between Old Timboon Road and Cuthberts Road, Camperdown (1.53km) Corangamite Shire.
    • between Bacchus Marsh Road centre pier and Anakie Road ramp, Norlane (701m), City of Greater Geelong.
    • between the Midland Highway centre pier and end of noise wall, Geelong (246m), City of Greater Geelong.
    • between Wiridgil Lane and Johnstones Road, Weerire (1.4km), Corangamite Shire.
  • Surf Coast Highway, between Pioneer Road and Perrett Street, Grovedale (303m), City of Greater Geelong.
  • Glenelg Highway, between Carapook Road and Muntham Lane, Muntham (1.3km), Glenelg Shire.
  • Mortlake-Ararat Road, between North Road and Campbells Lane, Mortlake (1.3km), Corangamite Shire.

Resurfacing work will also be carried out on many roads across the Barwon South West region as part of the 2024-25 Victorian road maintenance program.

Rehabilitation works on the following roads in the Barwon South West region are complete:

  • Darlington-Camperdown Road, between Newminster Road and Kilnoorat Road (1.8km) in Corangamite Shire.
  • Terang-Mortlake Road, between McCrae Street and Dalvui Lane (3.5km) in Corangamite Shire
  • Mackinnons Bridge-Noorat Road, between Princes Highway West and Blacks Drive (2.3km) in Corangamite Shire